Skip to content

Prepare GH workflow actions for new charm #2

Prepare GH workflow actions for new charm

Prepare GH workflow actions for new charm #2

Triggered via pull request December 4, 2023 21:34
Status Failure
Total duration 12m 13s
Artifacts 2

integration_test.yaml

on: pull_request
integration-tests  /  ...  /  Get runner image
3s
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
3s
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
5s
integration-tests / Build rock / Get rocks
integration-tests  /  Build and push charm
3m 10s
integration-tests / Build and push charm
Matrix: integration-tests / Build image / Build image
Matrix: integration-tests / Build rock / Build rock
integration-tests  /  Get rocks or Docker images
1s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Required Integration Test Status Checks
2s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

3 errors
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
k8s-charm Expired
6.64 MB
k8s-images Expired
1 Byte