Skip to content

Update charm libraries #59

Update charm libraries

Update charm libraries #59

Triggered via pull request January 22, 2024 16:04
Status Failure
Total duration 6h 1m 17s
Artifacts

pull-request.yaml

on: pull_request
PR  /  Check against ignorelist
4s
PR / Check against ignorelist
PR  /  ...  /  Static Analysis of Libs
16s
PR / Quality Checks / Static Analysis / Static Analysis of Libs
PR  /  ...  /  Static Analysis of Charm
17s
PR / Quality Checks / Static Analysis / Static Analysis of Charm
PR  /  ...  /  Lint
13s
PR / Quality Checks / Linting / Lint
PR  /  ...  /  Unit tests
17s
PR / Quality Checks / Unit Tests / Unit tests
PR  /  ...  /  Scenario tests
26s
PR / Quality Checks / Scenario Tests / Scenario tests
PR  /  ...  /  Check the CHARMHUB_TOKEN secret
0s
PR / Quality Checks / Check the CHARMHUB_TOKEN secret
PR  /  ...  /  check
9s
PR / Quality Checks / Inclusive naming / check
Matrix: PR / Quality Checks / CodeQL analysis / Analyze
PR  /  ...  /  Integration Tests
6h 0m
PR / Quality Checks / Integration Tests / Integration Tests
PR  /  ...  /  Check libraries
30s
PR / Quality Checks / Check libraries
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
PR / Quality Checks / Integration Tests / Integration Tests
The job running on runner GitHub Actions 43 has exceeded the maximum execution time of 360 minutes.
PR / Quality Checks / Integration Tests / Integration Tests
The operation was canceled.
PR / Quality Checks / CodeQL analysis / Analyze (python)
1 issue was detected with this workflow: Please specify an on.push hook to analyze and see code scanning alerts from the default branch on the Security tab.