Skip to content

Unleash the matrix

Unleash the matrix #62

Triggered via push May 21, 2024 01:22
Status Failure
Total duration 9m 55s
Artifacts

cabal.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 6 warnings
ghc-9.4.8
Process completed with exit code 1.
ghc-9.6.5
The job was canceled because "_3_10_3_0_9_4_8_lts-21_25" failed.
ghc-9.6.5
The operation was canceled.
ghc-9.2.8
The job was canceled because "_3_10_3_0_9_4_8_lts-21_25" failed.
ghc-9.2.8
The operation was canceled.
ghc-9.8.2: library/Hpack/Fields.hs#L10
The import of ‘Control.Applicative’ is redundant
ghc-9.8.2: library/Hpack/Fields.hs#L10
The import of ‘Control.Applicative’ is redundant
ghc-9.8.2: library/Hpack/Fields.hs#L10
The import of ‘Control.Applicative’ is redundant
ghc-9.8.2: library/Hpack/Fields.hs#L10
The import of ‘Control.Applicative’ is redundant
ghc-9.8.2: library/Hpack/Fields.hs#L10
The import of ‘Control.Applicative’ is redundant
ghc-9.8.2: library/Hpack/Fields.hs#L10
The import of ‘Control.Applicative’ is redundant