Skip to content

...

... #44

Triggered via push May 20, 2024 17:22
Status Failure
Total duration 1m 21s
Artifacts

cabal.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
ghc-9.8.2
Process completed with exit code 1.
ghc-9.6.5
The job was canceled because "_3_10_9_8_2_nightly-2024-" failed.
ghc-9.6.5
The operation was canceled.
ghc-9.4.8
The job was canceled because "_3_10_9_8_2_nightly-2024-" failed.
ghc-9.4.8
The operation was canceled.
ghc-9.2.8
The job was canceled because "_3_10_9_8_2_nightly-2024-" failed.
ghc-9.2.8
The operation was canceled.