forked from cyclus/cyclus
-
Notifications
You must be signed in to change notification settings - Fork 0
cep0
bennibbelink edited this page Apr 8, 2024
·
1 revision
|Cyclus| Enhancement Proposals
CEP: | 0 |
---|---|
Title: | Index of |Cyclus| Enhancement Proposals (CEPs) |
Version: | N/A |
Last-Modified: | 2013-11-01 |
Author: | Anthony Scopatz <scopatz at gmail.com> |
Status: | Active |
Type: | Informational |
Created: | 2013-07-03 |
This CEP contains the index of all |Cyclus| Enhancement Proposals, known as CEPs. CEP numbers are assigned by the CEP editors, and once assigned are never changed. The git history of the CEP texts here represent their historical record.
Meta-CEPs (CEPs about CEPs or Processes)
.. toctree:: :maxdepth: 1 PA - 1 - CEP Purpose and Guidelines - Scopatz <cep1> PA - 2 - Separation of Concerns in the Cyclus Ecosystem - Scopatz <cep2> PA - 3 - Release Procedure - Scopatz <cep3> PD - 4 - Attribution of Code Products in the |Cyclus| Ecosystem - Huff <cep4> PL - 5 - Archetype Development Best Practices - Gidden <cep5> PD - 6 - Cyclus Pull Request Style Guide - Gidden <cep6> PD - 80 - Cycamore Archetype API/Warning Requirements - Gidden <cep80>
Standard CEPs
.. toctree:: :maxdepth: 1 SA - 17 - Resource Tracking and Interfaces Re-Re-Redo - Carlsen <cep17> SA - 18 - Dynamic Resource Exchange Procedure - Gidden <cep18> SW - 19 - Cyclus Input Procedure Updates - Flanagan <cep19> SA - 20 - Time Step Execution Stack - Gidden <cep20> SA - 21 - Agent Identification and Discovery - Carlsen <cep21> SL - 22 - Logging Methodology and Implementation - Gidden <cep22> SA - 23 - Defining Time Step Length, High Noon for Blue Moon - Scopatz <cep23> SA - 24 - Default Preferences - Gidden <cep24> SA - 25 - Preference Adjustment Process - Gidden <cep25> SD - 26 - Generalize the DRE to Optimize Multiple Metrics - Flanagan, Scopatz <cep26> SA - 27 - Toolkit Capabilities Injection into an Archetype - Mouginot <cep27> SD - 29 - Packaging of Materials - Mummah <cep29>
- S - Standards Track CEP
- I - Informational CEP
- P - Process CEP
- A - Accepted proposal
- R - Rejected proposal
- W - Withdrawn proposal
- L - Deferred proposal
- F - Final proposal
- C - Active proposal
- D - Draft proposal
- U - Superseded proposal