chore(repo): Updated CW Metrics #247
Triggered via pull request
September 14, 2023 18:28
Status
Cancelled
Total duration
4m 54s
Artifacts
–
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
amplify_canaries.yaml
on: pull_request
Matrix: build
Matrix: e2e-android
Matrix: e2e-ios
Annotations
12 errors and 1 warning
e2e-android (stable, any)
Canceling since a higher priority waiting request for 'Amplify Canaries-refs/pull/3741/merge' exists
|
e2e-android (stable, any)
The operation was canceled.
|
e2e-android (stable, 3.10.1)
The operation was canceled.
|
e2e-android (beta, any)
The operation was canceled.
|
e2e-ios (stable, any, 14.5)
The operation was canceled.
|
e2e-ios (stable, 3.10.1)
The operation was canceled.
|
e2e-ios (beta, any, 14.5)
The operation was canceled.
|
e2e-ios (beta, any, 16)
The operation was canceled.
|
build (stable, any)
The operation was canceled.
|
build (stable, 3.10.1)
The operation was canceled.
|
build (beta, any)
The operation was canceled.
|
e2e-ios (stable, any, 16)
The operation was canceled.
|
e2e-ios (stable, any, 16)
Unable to clean or reset the repository. The repository will be recreated instead.
|