Skip to content

[FLINK-36928] Split the action of Epoch into two parts (trigger & final) #295

[FLINK-36928] Split the action of Epoch into two parts (trigger & final)

[FLINK-36928] Split the action of Epoch into two parts (trigger & final) #295

Triggered via push December 18, 2024 07:57
Status Failure
Total duration 5h 45m 30s
Artifacts 7

ci.yml

on: push
Default (Java 11)  /  Compile
34m 57s
Default (Java 11) / Compile
Pre-compile Checks  /  Basic QA
7m 37s
Pre-compile Checks / Basic QA
Default (Java 11)  /  Test packaging/licensing
34m 40s
Default (Java 11) / Test packaging/licensing
Matrix: Default (Java 11) / e2e
Matrix: Default (Java 11) / test
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Default (Java 11) / E2E (group 2)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 310 minutes.
Default (Java 11) / E2E (group 2)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-artifacts-flink-ci-beta-295 Expired
92.4 MB
logs-test-flink-ci-beta-295-connect-test-1734510985
4.41 MB
logs-test-flink-ci-beta-295-core-test-1734510979
14.2 MB
logs-test-flink-ci-beta-295-misc-test-1734510968
1.54 MB
logs-test-flink-ci-beta-295-python-test-1734510962
5.02 MB
logs-test-flink-ci-beta-295-table-test-1734510969
44.9 MB
logs-test-flink-ci-beta-295-tests-test-1734510965
20.9 MB