Skip to content

[hotfix][state/forst] Use correct executor for ForSt coordinator #254

[hotfix][state/forst] Use correct executor for ForSt coordinator

[hotfix][state/forst] Use correct executor for ForSt coordinator #254

Triggered via push September 27, 2024 10:51
Status Failure
Total duration 3h 10m 7s
Artifacts 7

ci.yml

on: push
Default (Java 8)  /  Compile
32m 55s
Default (Java 8) / Compile
Pre-compile Checks  /  Basic QA
9m 11s
Pre-compile Checks / Basic QA
Default (Java 8)  /  Test packaging/licensing
36m 25s
Default (Java 8) / Test packaging/licensing
Matrix: Default (Java 8) / e2e
Matrix: Default (Java 8) / test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Default (Java 8) / Test (module: connect)
Process completed with exit code 1.
Default (Java 8) / Test (module: core)
Process completed with exit code 1.
Default (Java 8) / Test (module: table)
Process completed with exit code 1.
Default (Java 8) / Test (module: misc)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
build-artifacts-flink-ci-beta-254 Expired
95.5 MB
logs-test-flink-ci-beta-254-connect-test-1727436487 Expired
46.3 KB
logs-test-flink-ci-beta-254-core-test-1727436486 Expired
10.9 MB
logs-test-flink-ci-beta-254-misc-test-1727436482 Expired
750 MB
logs-test-flink-ci-beta-254-python-test-1727436515 Expired
5.01 MB
logs-test-flink-ci-beta-254-table-test-1727436483 Expired
40.2 MB
logs-test-flink-ci-beta-254-tests-test-1727436489 Expired
22.7 MB