296 add deployment workflow #12
main-cicd.yml
on: pull_request
Matrix: static-checks / Run static checks
integration-tests
/
Run integration tests
3m 6s
build-package
/
Build wheel and sdist
39s
upload-package
/
Upload wheel and sdist
Annotations
2 errors
integration-tests / Run integration tests
The run was canceled by @Kamforka.
|
integration-tests / Run integration tests
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
dist
Expired
|
79.9 KB |
|