feat(jobreceiver): Implement monitoring job receiver #4049
pull_requests.yml
on: pull_request
Matrix: Build
markdownlint
7s
yamllint
9s
markdown-link-check
21s
md-links-lint
10s
plugins-check
9s
pre-commit-check
12s
Check uniform dependencies
2s
shellcheck
8s
Test (SumoLogic.wixext)
1m 48s
Matrix: Lint (golangci-lint)
Matrix: Test Install Script
Matrix: Test
Matrix: Build container
Annotations
9 errors
Lint (golangci-lint) (linux_amd64)
ineffectual assignment to err (ineffassign)
|
Lint (golangci-lint) (linux_amd64)
ineffectual assignment to err (ineffassign)
|
Lint (golangci-lint) (linux_amd64)
Process completed with exit code 2.
|
Test (linux_amd64, ubuntu-20.04, true) / Test
Process completed with exit code 2.
|
Test (linux_amd64, ubuntu-20.04) / Test
FailFast: cancelling since parallel instance has failed
|
Test (linux_amd64, ubuntu-20.04) / Test
github.com/klauspost/[email protected]: read "https:/proxy.golang.org/@v/v1.16.5.zip": read tcp 10.1.0.36:37216->142.250.115.207:443: read: connection reset by peer
|
Test (linux_amd64, ubuntu-20.04) / Test
The operation was canceled.
|
Test (darwin_amd64, macos-latest) / Test
FailFast: cancelling since parallel instance has failed
|
Test (darwin_amd64, macos-latest) / Test
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
otelcol-sumo-darwin_amd64
Expired
|
220 MB |
|
otelcol-sumo-darwin_arm64
Expired
|
212 MB |
|
otelcol-sumo-fips-linux_amd64
Expired
|
229 MB |
|
otelcol-sumo-linux_amd64
Expired
|
191 MB |
|
otelcol-sumo-linux_arm64
Expired
|
181 MB |
|
otelcol-sumo-windows_amd64.exe
Expired
|
191 MB |
|