Skip to content

Merge pull request #2 from Slmaking/Slmaking-patch-1 #8

Merge pull request #2 from Slmaking/Slmaking-patch-1

Merge pull request #2 from Slmaking/Slmaking-patch-1 #8

Triggered via push September 26, 2023 20:01
Status Failure
Total duration 23s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 2.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
Process completed with exit code 2.
build (3.8)
The job was canceled because "_3_10" failed.
build (3.8)
The operation was canceled.