Skip to content

Merge pull request #1 from Slmaking/Slmaking-patch-1 #6

Merge pull request #1 from Slmaking/Slmaking-patch-1

Merge pull request #1 from Slmaking/Slmaking-patch-1 #6

Triggered via push September 24, 2023 18:24
Status Failure
Total duration 27s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 2.
build (3.8)
The job was canceled because "_3_10" failed.
build (3.8)
Process completed with exit code 2.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
The operation was canceled.