Properly configure SSH from scratch #15
build-and-push.yaml
on: push
get-ubuntu-versions
6s
Matrix: build-push-images
Annotations
11 errors
build-push-images (16.04)
Process completed with exit code 127.
|
build-push-images (14.04)
The job was canceled because "_16_04" failed.
|
build-push-images (14.04)
Process completed with exit code 127.
|
build-push-images (18.04)
The job was canceled because "_16_04" failed.
|
build-push-images (18.04)
The operation was canceled.
|
build-push-images (24.04)
The job was canceled because "_16_04" failed.
|
build-push-images (24.04)
The operation was canceled.
|
build-push-images (22.04)
The job was canceled because "_16_04" failed.
|
build-push-images (22.04)
The operation was canceled.
|
build-push-images (20.04)
The job was canceled because "_16_04" failed.
|
build-push-images (20.04)
The operation was canceled.
|