Skip to content

Merge pull request #13 from PrediktorAS/PENGSOL-248-fix-connection-st… #89

Merge pull request #13 from PrediktorAS/PENGSOL-248-fix-connection-st…

Merge pull request #13 from PrediktorAS/PENGSOL-248-fix-connection-st… #89

Triggered via push December 19, 2024 19:14
Status Failure
Total duration 37s
Artifacts

tox.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 2 warnings
build (3.10)
Process completed with exit code 1.
build (3.11)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
Process completed with exit code 1.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
The operation was canceled.
build (3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636