Skip to content
Triggered via push June 9, 2024 13:06
Status Failure
Total duration 1m 29s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (ubuntu-latest, gcc, -O3 -ftree-vectorize -fopt-info-vec-optimized)
Process completed with exit code 2.
build (macOS-latest, clang, -O3 -Rpass=loop-vectorize)
The job was canceled because "ubuntu-latest_gcc_-O3_-ft" failed.
build (macOS-latest, clang, -O3 -Rpass=loop-vectorize)
The operation was canceled.
build (windows-latest, cl, /O2 /Qvec-report:2)
The job was canceled because "ubuntu-latest_gcc_-O3_-ft" failed.
build (windows-latest, cl, /O2 /Qvec-report:2)
The operation was canceled.