Skip to content

build(deps): bump actions/upload-artifact from 4.5.0 to 4.6.0 #516

build(deps): bump actions/upload-artifact from 4.5.0 to 4.6.0

build(deps): bump actions/upload-artifact from 4.5.0 to 4.6.0 #516

Status Failure
Total duration 3m 37s
Artifacts

matlab.yml

on: push
Matrix: Run MATLAB Tests
Package MATLAB Toolbox
0s
Package MATLAB Toolbox
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
Run MATLAB Tests (R2024a)
HttpError: Resource not accessible by integration
Run MATLAB Tests (R2024b)
The job was canceled because "R2024a" failed.
Run MATLAB Tests (R2024b)
The operation was canceled.
Run MATLAB Tests (R2023b)
The job was canceled because "R2024a" failed.
Run MATLAB Tests (R2023b)
The operation was canceled.
Run MATLAB Tests (R2024a)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636