Skip to content

Merge pull request #112 from F1uctus/dependabot/pip/ruff-0.1.1 #233

Merge pull request #112 from F1uctus/dependabot/pip/ruff-0.1.1

Merge pull request #112 from F1uctus/dependabot/pip/ruff-0.1.1 #233

Triggered via push October 24, 2023 07:53
Status Failure
Total duration 1m 20s
Artifacts

python-build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
The operation was canceled.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.