Skip to content

Merge pull request #108 from F1uctus/dependabot/pip/ruff-0.0.292 #224

Merge pull request #108 from F1uctus/dependabot/pip/ruff-0.0.292

Merge pull request #108 from F1uctus/dependabot/pip/ruff-0.0.292 #224

Triggered via push October 9, 2023 20:40
Status Failure
Total duration 1m 23s
Artifacts

python-build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_10" failed.
build (3.8)
The operation was canceled.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
The operation was canceled.