prop.6.0-production-singleElectron-0-20-GeV
cdean-github
released this
07 Dec 04:12
·
5 commits
to production_singleElectron_0-20GeV
since this release
December-2021-Concept release
This release produces the detector concept released after the proposal. Changes wrt prop.5.2
The EGEM and FGEM are disabled in line with our costing
The EEMCH is redesigned and the carbon layers are reduced from 2mm to 0.5mm