Notifications
You must be signed in to change notification settings - Fork 0
/
Copy pathfunctions.jl
352 lines (302 loc) · 22.9 KB
/
functions.jl
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
##### defining structs #####
"""
The project struct is a mutable struct that represents an investment project. It has the following fields:
name: a string that specifies the investment concept.
type: a string that specifies the investment type.
investment: a floating-point number that represents the investment estimate by the manufacturer in USD/MW.
plant_capacity: a floating-point number that represents the plant capacity in MW.
learning_factor: a floating-point number that represents the learning factor.
time: an abstract vector that represents the project time in years, which includes the construction time and plant lifetime.
loadfactor: an abstract vector that represents the load factor. It includes the lower and upper bounds of a random variable.
operating_cost: an abstract vector that represents the O&M cost, including O&M fix cost in USD/MW, O&M variable cost in USD/MWh, and fuel cost in USD/MWh.
reference_pj: an abstract vector that represents the reference reactor, which includes investment costs in USD/MW and plant capacity in MW.
"""
mutable struct project
name::String # investment concept
type::String # investment type
investment::Float64 # investment estimate by manufacturer [USD/MW]
plant_capacity::Float64 # plant capacity [MW]
learning_factor::Float64 # learning factor
time::AbstractVector # project time [years] (construction time, plant lifetime)
loadfactor::AbstractVector # load factor, lower, and upper bound of rand variable
operating_cost::AbstractVector # O&M cost (O&M fix cost [USD/MW], O&M variable cost [USD/MWh], fuel cost [USD/MWh])
reference_pj::AbstractVector # reference reactor (investment costs [USD/MW], plant capacity [MW])
end
##### defining functions #####
"""
The gen_rand_vars function generates random variables for a given investment project, pj, based on a specified scaling option, opt_scaling, the number of simulations to run, n, a range of weighted average cost of capital (WACC) values, wacc, and a range of electricity price values, electricity_price.
The total time of the reactor project, which is the sum of the construction time and operating time, is calculated by adding the elements at index 1 and 2 of the pj.time vector.
Next, the function generates uniformly distributed random variables for the WACC, electricity price, and load factor using the rand function. The range of values for each variable is determined by the input ranges of wacc and electricity_price, and the pj.loadfactor attribute.
The function then generates random project-specific variables based on the opt_scaling input. The function has four different branches of execution based on the value of opt_scaling.
If opt_scaling is "Manufacturer", the function uses manufacturer estimates to calculate a deterministic investment cost, rand_investment, which is the product of pj.investment, pj.plant_capacity, and ones(n) (where ones(n) is an array of n ones) multiplied by (1-pj.learning_factor)
If opt_scaling is "Roulstone", the function uses Roulstone scaling to calculate a random investment cost, rand_investment, which is the product of pj.reference_pj[1], pj.reference_pj[2], (1-pj.learning_factor), (pj.plant_capacity/pj.reference_pj[2]) raised to the power of a random scaling factor, rand_scaling, within the range specified in the scaling input.
If opt_scaling is "Rothwell", the function uses Rothwell scaling to calculate a random investment cost, rand_investment, which is the product of pj.reference_pj[1], pj.reference_pj[2], (1-pj.learning_factor), (pj.plant_capacity/pj.reference_pj[2]) raised to the power of 1 + logarithm base 2 of rand_scaling which is calculated by the range specified in the scaling input
If opt_scaling is "uniform", the function uses a uniform scaling to calculate a random investment cost, rand_investment, which is a random value within the range specified in the scaling input
If the opt_scaling is not one of the above, the function print an error message, "Option for the scaling method is unknown."
Finally, the function returns the generated random variables in the form of a named tuple with four fields: wacc, electricity_price, loadfactor, and investment and their corresponding values.
"""
function gen_rand_vars(opt_scaling::String, n::Int64, wacc::Vector, electricity_price::Vector, pj::project)
@info "generating random variables"
# total time of reactor project, i.e., construction and operating time
total_time = pj.time[1] + pj.time[2]
# generation of uniformly distributed random non-project specific variables
rand_wacc = wacc[1] .+ (wacc[2]-wacc[1]) * rand(n)
rand_electricity_price = electricity_price[1] .+ (electricity_price[2]-electricity_price[1]) * rand(n,total_time)
rand_loadfactor = pj.loadfactor[1] .+ (pj.loadfactor[2]-pj.loadfactor[1]) * rand(n,total_time)
# generation of uniformly distributed random project specific variables
# scaling case distinction
# Note that the scaling parameter here are converted such that Rothwell and Roulstone coincide.
if opt_scaling == "manufacturer"
@info("using manufacturer estimates")
# deterministic investment cost based on manufacturer estimates [USD]
rand_investment = pj.investment * pj.plant_capacity * ones(n) * (1-pj.learning_factor)
elseif opt_scaling == "roulstone"
@info("using Roulstone scaling")
# random investment cost based on Roulstone [USD]
rand_scaling = scaling[1] .+ (scaling[2] - scaling[1]) .* rand(n,1)
rand_investment = pj.reference_pj[1] * pj.reference_pj[2] * (1-pj.learning_factor) * (pj.plant_capacity/pj.reference_pj[2]) .^ (rand_scaling)
elseif opt_scaling == "rothwell"
@info("using Rothwell scaling")
# random investment cost based on Rothwell [USD]
rand_scaling = 2^(scaling[1]-1) .+ (2^(scaling[2]-1) - 2^(scaling[1]-1)) .* rand(n,1)
rand_investment = pj.reference_pj[1] * pj.reference_pj[2] * (1-pj.learning_factor) * (pj.plant_capacity/pj.reference_pj[2]) .^ (1 .+ log.(rand_scaling) ./ log(2))
elseif opt_scaling == "uniform"
@info("using uniform scaling")
# random investment cost uniform [USD]
investment_scaled = pj.reference_pj[1] * pj.reference_pj[2] * (pj.plant_capacity/pj.reference_pj[2]) .^ (scaling)
rand_investment = investment_scaled[1] .+ (investment_scaled[2]-investment_scaled[1]) .* rand(n,1) .* (1-pj.learning_factor)
else
@error("Option for the scaling method is unknown.")
end
# output
return(wacc = rand_wacc, electricity_price = rand_electricity_price, loadfactor = rand_loadfactor, investment = rand_investment)
end
"""
The mc_run function performs a Monte Carlo simulation for an investment project, pj, based on a specified number of simulations to run, n, and a set of random variables, rand_vars.
The function first initializes the total time of the reactor project, which is the sum of the construction time and operating time, and the fixed and variable operating and maintenance (O&M) costs.
It then initializes variables for the random variables, cash inflow, cash outflow, cashflow, discounted cash outflow, NPV in period t, generated electricity, and discounted generated electricity.
The function then enters a simulation loop that iterates over the total time of the project. For each time step, the function performs different calculations depending on whether the time step is before or after the construction time.
If the time step is before the construction time, the function calculates the cash outflow as the investment cost divided by the construction time, and cashflow as the difference between cash inflow and cash outflow.
If the time step is after the construction time, the function calculates the amount of electricity produced, cash inflow from electricity sales, cash outflow for O&M costs, cashflow, discounted cash outflow, discounted electricity.
Finally, the function returns the results of the simulation in the form of a named tuple with three fields: disc_cash_out, disc_cash_net, and disc_electricity and their corresponding values.
"""
function mc_run(n::Int64, pj::project, rand_vars)
@info "running Monte Carlo simulation"
# project data
# total time of reactor project, i.e., construction and operating time
total_time = pj.time[1] + pj.time[2]
# O&M costs
# fixed O&M costs [USD/year]
operating_cost_fix = pj.plant_capacity * pj.operating_cost[1]
# variable O&M costs [USD/MWh]
operating_cost_variable = pj.operating_cost[2] + pj.operating_cost[3]
# initialize variables
# random variables
rand_wacc = rand_vars.wacc
rand_electricity_price = rand_vars.electricity_price
rand_loadfactor = rand_vars.loadfactor
rand_investment = rand_vars.investment
# cash inflow
cash_in = zeros(Float64, n, total_time)
# cash outflow
cash_out = zeros(Float64, n, total_time)
# cashflow = inflow - outflow
cash_net = zeros(Float64, n, total_time)
# discounted cash outflow
disc_cash_out = zeros(Float64, n, total_time)
# NPV in period t
disc_cash_net = zeros(Float64, n, total_time)
# generated electricity
electricity = zeros(Float64, n, total_time)
# discounted generated electricity
disc_electricity = zeros(Float64, n, total_time)
# simulation loop
for t in 1:total_time
if t <= pj.time[1]
cash_out[:,t] = rand_investment ./ pj.time[1]
cash_net[:,t] = cash_in[:,t] - cash_out[:,t]
else
# amount of electricity produced
electricity[:,t] = pj.plant_capacity .* rand_loadfactor[:,t] .* 8760
# cash inflow from electricity sales
cash_in[:,t] = rand_electricity_price[:,t] .* electricity[:,t]
# cash outflow O&M costs
cash_out[:,t] = operating_cost_fix .+ operating_cost_variable * electricity[:,t]
cash_net[:,t] = cash_in[:,t] - cash_out[:,t]
disc_electricity[:,t] = electricity[:,t] ./ ((1 .+ rand_wacc[:]) .^ (t-1))
end
disc_cash_out[:,t] = cash_out[:,t] ./ ((1 .+ rand_wacc[:]) .^ (t-1))
disc_cash_net[:,t] = cash_net[:,t] ./ ((1 .+ rand_wacc[:]) .^ (t-1))
end
# output
return(disc_cash_out = disc_cash_out, disc_cash_net = disc_cash_net, disc_electricity = disc_electricity)
end
"""
The npv_lcoe function calculates the net present value (NPV) and levelized cost of electricity (LCOE) for a given input, disc_res. The input, disc_res, is assumed to be an object with three attributes: disc_cash_out, disc_cash_net, and disc_electricity.
Next, the function creates three local variables disc_cash_out, disc_cash_net, and disc_electricity which are assigned the values of the corresponding attributes of the input disc_res.
The NPV is then calculated by taking the sum of the disc_cash_net variable along the second dimension using the sum function. Similarly, the LCOE is calculated by taking the ratio of the sum of the disc_cash_out variable along the second dimension to the sum of the disc_electricity variable along the second dimension.
Finally, the function returns a named tuple with two fields, npv and lcoe with the calculated values.
"""
function npv_lcoe(disc_res)
@info "calculating NPV and LCOE"
disc_cash_out = disc_res.disc_cash_out
disc_cash_net = disc_res.disc_cash_net
disc_electricity = disc_res.disc_electricity
npv = sum(disc_cash_net,dims=2)
lcoe = sum(disc_cash_out,dims=2) ./ sum(disc_electricity,dims=2)
return(npv = npv, lcoe = lcoe)
end
"""
The investment_simulation function simulates an investment project, given an instance of the project type pj and a set of random variables rand_vars.
The function runs a Monte Carlo simulation by calling the mc_run function and passing in the number of simulations to run, n, the project pj, and the set of random variables rand_vars. The function saves the results of the Monte Carlo simulation in the local variable disc_res.
The function then calculates the net present value (NPV) and the levelized cost of electricity (LCOE) by calling the npv_lcoe function and passing in the disc_res variable as input. The results of this calculation are saved in the local variable res.
The function then returns the results of the simulation in the form of the res variable.
"""
function investment_simulation(pj::project, rand_vars)
# run the Monte Carlo simulation
disc_res = mc_run(n, pj, rand_vars)
# NPV and LCOE calculation
res = npv_lcoe(disc_res)
# output
@info "simulation results" pj.name pj.type NPV = mean(res[1]) LCOE = mean(res[2])
return(res)
end
"""
The si_correct function takes in a sensitivity index value si and returns a corrected sensitivity index value.
If si is approximately equal to negative zero (-0.0) with an absolute tolerance of 1e-2, the function returns a float 0.0. If si is greater than 1.0, the function returns 1.0. Otherwise, the function returns si unchanged.
The purpose of this function is to correct any sensitivity index values that may be out of range or have unexpected floating point behavior due to numerical errors.
"""
function si_correct(si)
if isapprox(si, -0.0, atol = 1e-2)
return 0.0
elseif si > 1.0
return 1.0
else
return si
end
end
"""
The si_first_order function calculates the first-order Sobol' index (also called variance-based sensitivity index) for a given random variable.
The function takes three arguments, A, B, and AB, which represent random variable matrices.
The first-order sensitivity index measures the impact of each individual random variable on the output of a simulation model.
The function computes the first-order sensitivity index using the formula: mean(B .* (AB .- A)) / var(vcat(A, B), corrected = false).
The function then applies a correction using the "si_correct" function to ensure that the sensitivity index is within the range of 0 and 1.
The function returns the corrected first-order sensitivity index as a float value.
Input Arguments
A: An array of output values corresponding to one set of random input values.
B: An array of output values corresponding to another set of random input values.
AB: A matrix of output values corresponding to the set of random input variables used for matrix A except for one variable coresponding to the random input used for matrix B.
"""
# first-order sensitivity index
function si_first_order(A,B,AB)
si = mean(B .* (AB .- A)) / var(vcat(A, B), corrected = false)
si = si_correct(si)
return si
end
"""
The si_total_order function computes the total-order Sobol' index (also called variance-based sensitivity index) for a given random variable.
The function takes three arguments, A, B, and AB, which represent random variable matrices.
The total-order sensitivity index is a measure of the impact of each input on the output, taking into account the effect of the input in combination with all other inputs.
The function computes the total-order sensitivity index using the formula: si = 0.5 * mean((A .- AB).^2) / var(vcat(A, B), corrected = false).
The function then applies a correction using the "si_correct" function to ensure that the sensitivity index is within the range of 0 and 1.
The function returns the corrected total-order sensitivity index as a float value.
Input Arguments
A: An array of output values corresponding to one set of random input values.
B: An array of output values corresponding to another set of random input values.
AB: A matrix of output values corresponding to the set of random input variables used for matrix A except for one variable coresponding to the random input used for matrix B.
"""
# total-effect sensitivity index
function si_total_order(A,B,AB)
si = 0.5 * mean((A .- AB).^2) / var(vcat(A, B), corrected = false)
si = si_correct(si)
return si
end
"""
The sensiticity_index function calculates sensitivity indices for a given project based on the input parameters. The function takes in five arguments:
opt_scaling: A string representing the type of optimization scaling to use.
n: An integer representing the number of simulations to run for each random variable.
wacc: A vector of doubles representing the weighted average cost of capital for each year of the project.
electricity_price: A vector of doubles representing the electricity prices for each year of the project.
pj: A project object containing all relevant information about the project.
The function then generates two random variable matrices A and B using the gen_rand_vars function. It then builds four matrices AB from A and B for each random variable. The function then runs Monte Carlo simulations for A, B, and each AB matrix, using the investment_simulation function.
The function then calculates sensitivity indices for both NPV and LCOE. The sensitivity indices are calculated separately for each random variable, and both first-order and total-order sensitivity indices are calculated. The resulting sensitivity indices are stored in tuples S_NPV, ST_NPV, S_LCOE, and ST_LCOE.
Finally, the function outputs the sensitivity results for the project, including the project's name, type, and the calculated sensitivity indices for NPV and LCOE. The function returns a tuple containing the sensitivity indices for NPV and LCOE.
"""
function sensitivity_index(opt_scaling::String, n::Int64, wacc::Vector, electricity_price::Vector, pj::project)
# generate random variable matrices A and B
@info "generating matrix A"
rand_vars_A = gen_rand_vars(opt_scaling, n, wacc, electricity_price, pj);
@info "generating matrix B"
rand_vars_B = gen_rand_vars(opt_scaling, n, wacc, electricity_price, pj);
# build random variable matrices AB from A and B for each random variable
@info "building matrices AB"
rand_vars_AB1 = (wacc = rand_vars_B.wacc, electricity_price = rand_vars_A.electricity_price, loadfactor = rand_vars_A.loadfactor, investment = rand_vars_A.investment);
rand_vars_AB2 = (wacc = rand_vars_A.wacc, electricity_price = rand_vars_B.electricity_price, loadfactor = rand_vars_A.loadfactor, investment = rand_vars_A.investment);
rand_vars_AB3 = (wacc = rand_vars_A.wacc, electricity_price = rand_vars_A.electricity_price, loadfactor = rand_vars_B.loadfactor, investment = rand_vars_A.investment);
rand_vars_AB4 = (wacc = rand_vars_A.wacc, electricity_price = rand_vars_A.electricity_price, loadfactor = rand_vars_A.loadfactor, investment = rand_vars_B.investment);
# run Monte Carlo simulations for A, B, and AB
@info "matrix A:"
sensi_res_A = investment_simulation(pj, rand_vars_A);
@info "matrix B:"
sensi_res_B = investment_simulation(pj, rand_vars_B);
@info "matrix AB1"
sensi_res_AB1 = investment_simulation(pj, rand_vars_AB1);
@info "matrix AB2"
sensi_res_AB2 = investment_simulation(pj, rand_vars_AB2);
@info "matrix AB3"
sensi_res_AB3 = investment_simulation(pj, rand_vars_AB3);
@info "matrix AB4"
sensi_res_AB4 = investment_simulation(pj, rand_vars_AB4);
# sensitivity indices for NPV
s_npv = (
wacc = si_first_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB1[1]),
electricity_price = si_first_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB2[1]),
loadfactor = si_first_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB3[1]),
investment = si_first_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB4[1]),
)
st_npv = (
wacc = si_total_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB1[1]),
electricity_price = si_total_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB2[1]),
loadfactor = si_total_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB3[1]),
investment = si_total_order(sensi_res_A[1], sensi_res_B[1], sensi_res_AB4[1])
)
# sensitivity indices for LCOE
s_lcoe = (
wacc = si_first_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB1[2]),
electricity_price = si_first_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB2[2]),
loadfactor = si_first_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB3[2]),
investment = si_first_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB4[2]),
)
st_lcoe = (
wacc = si_total_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB1[2]),
electricity_price = si_total_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB2[2]),
loadfactor = si_total_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB3[2]),
investment = si_total_order(sensi_res_A[2], sensi_res_B[2], sensi_res_AB4[2])
)
# output
@info "sensitivity results" pj.name pj.type S_NPV = s_npv ST_NPV = st_npv S_LCOE = s_lcoe ST_LCOE = st_lcoe
return(s_npv = s_npv, st_npv = st_npv, s_lcoe = s_lcoe, st_lcoe = st_lcoe)
end
"""
The gen_scaled_investment function takes in two arguments, scaling and pj, and returns an array containing the scaled investment costs for a given project.
Arguments
scaling::Vector: A vector of scaling parameters that determines the range of the scaled investment costs.
pj::project: An instance of the project struct that contains information about the investment concept, investment type, investment estimate by manufacturer, plant capacity, learning factor, project time, load factor, operating cost, and reference reactor.
Output
scaled_investment: A vector of scaled investment costs based on the project information and the given scaling parameter. The vector contains three parts:
The deterministic investment cost based on manufacturer estimates in USD per MW.
The range (lower and upper bound) of scaled investment cost based on Roulstone in USD per MW.
The range (lower and upper bound) of scaled investment cost based on Rothwell in USD per MW.
"""
function gen_scaled_investment(scaling::Vector, pj::project)
# generation of project specific scaled investment cost ranges
# note that the scaling parameter here are converted such that Rothwell and Roulstone coincide.
# deterministic investment cost based on manufacturer estimates [USD/MW]
scaled_investment = pj.investment
# scaled investment cost based on Roulstone [USD/MW]
scaled_investment = vcat(scaled_investment, pj.reference_pj[1] * pj.reference_pj[2] * (1-pj.learning_factor) * (pj.plant_capacity/pj.reference_pj[2]) .^ scaling / pj.plant_capacity)
# scaled investment cost based on Rothwell [USD/MW]
scaled_investment = vcat(scaled_investment, pj.reference_pj[1] * pj.reference_pj[2] * (1-pj.learning_factor) * (pj.plant_capacity/pj.reference_pj[2]) .^ (1 .+ log.(scaling) ./ log(2)) / pj.plant_capacity)
# output
return(scaled_investment = scaled_investment)
end