- Create a new issue to track the release process where you can copy-paste the present checklist from
dev/doc/release-process.md
. - Decide the release calendar with the team (date of branching, preview and final release).
- Create a wiki page that you link to from https://github.com/coq/coq/wiki/Release-Plan with this information and the link to the issue.
- Create both the upcoming final release (
X.X.0
) and the following major release (Y.Y+rc1
) milestones if they do not already exist. - Send an announcement of the upcoming branching date on Coqdev + the Coq development category on Discourse ([email protected] + [email protected]) and ask people to remove from the
X.X+rc1
milestone any feature and clean up PRs that they already know won't be ready on time. - In a PR on
master
, calldev/tools/update-compat.py
with the--release
flag; this sets up Coq to support three-compat
flag arguments including the upcoming one (instead of four). To ensure that CI passes, you will have to decide what to do about all test-suite files that mention-compat U.U
orCoq.Compat.CoqUU
(which is no longer valid, since we only keep compatibility against the two previous versions), and you may have to ping maintainers of projects that are still relying on the old compatibility flag so that they fix this. - Make sure that this change is merged in time for the branching date.
- Prepare a PR on
master
(not yet to be merged) changing the version name to the next major version and both magic numbers intools/configure/configure.ml
. For example, for8.5
, the version name will be8.5+alpha
while the magic numbers will end with80490
. Additionally, in the same commit, update the compatibility infrastructure, which consists of invokingdev/tools/update-compat.py
with the--master
flag. Note that theupdate-compat.py
script must be run twice: once in preparation of the release with the--release
flag (see earlier in this section) and once on the branching date with the--master
flag to mark the start of the next version. This PR should be opened before the branching date to have time to deal with CI issues, but should not be merged until branching.
- Merge the above PR and create the
vX.X
branch from the last merge commit before this one (using this name will ensure that the branch will be automatically protected). - Set the next major version alpha tag using
git tag -s
. TheVY.Y+alpha
tag marks the first commit to be inmaster
and not in thevX.X
release branch. Note that this commit is the first commit in the first PR merged in master, not the merge commit for that PR. Therefore, if you proceeded as described above, this should be the commit updating the version, magic numbers and compatibility infrastructure. After tagging, double-check thatgit describe
picks up the tag you just made (if not, you tagged the wrong commit). - Push the new tag with
git push upstream VY.Y+alpha --dry-run
(remove the--dry-run
and redo if everything looks OK). - Start a new "classic" project to track PR backporting. The project should have a
Request X.X+rc1 inclusion
column for the PRs that were merged inmaster
that are to be considered for backporting, and aShipped in X.X+rc1
columns to put what was backported. A message to@coqbot
in the milestone description tells it to automatically add merged PRs to theRequest ... inclusion
column and backported PRs to theShipped in ...
column. See previous milestones for examples. When moving to the next milestone (e.g.X.X.0
), you can clear and remove theRequest X.X+rc1 inclusion
column and create newRequest X.X.0 inclusion
andShipped in X.X.0
columns. The release manager is the person responsible for merging PRs that target the release branch and backporting appropriate PRs (mostly safe bug fixes, user message improvements and documentation updates) that are merged intomaster
. - Pin the versions of libraries and plugins in
dev/ci/ci-basic-overlay.sh
to use commit hashes. You can use thedev/tools/pin-ci.sh
script to do this semi-automatically. - In a PR on
master
to be backported, add a new link to the'versions'
list of the refman (inhtml_context
indoc/sphinx/conf.py
). - Ping
@Zimmi48
and@erikmd
to set up the infrastructure to have alpha Docker images built for the branch.
- Make sure that all the last feature PRs that you want to include in the release are finished and backported quickly and clean up the milestone. We recommend backporting as few feature PRs as possible after branching. In particular, any PR with overlays will require manually bumping the pinned commits when backporting.
- Delay non-blocking issues to the appropriate milestone and ensure blocking issues are solved. If required to solve some blocking issues, it is possible to revert some feature PRs in the release branch only (but in this case, the blocking issue should be postponed to the next major release instead of being closed).
- Once the final list of features is known, in a PR on
master
to be backported, generate the release changelog by callingdev/tools/generate-release-changelog.sh
and include it in a new section indoc/sphinx/changes.rst
. The script automatically reorders the entries to show first the Changed, then the Removed, Deprecated, Added and last the Fixed. Manual adjustement is still needed when multiple entries are combined in a single changelog file. - Ping the development coordinator (
@mattam82
) to get him started on writing the release summary. Thedev/tools/list-contributors.sh
script computes the number and list of contributors between Coq revisions. Typically used withVX.X+alpha..vX.X
to check the contributors of versionVX.X
. Note that this script relies on.mailmap
to merge multiple identities. If you notice anything incorrect while using it, use the opportunity to fix the.mailmap
file. Same thing if you want to have the full name of a contributor shown instead of a pseudonym. - Put the branch name in CACHEKEY in
.gitlab-ci.yml
(for instancebionic_coq-V2022-05-20-c34331afa5
to"bionic_coq-v8.16-V2022-05-20-c34331afa5
) to indicate that it shouldn't be cleaned up even once it gets old. This should be done after all PRs touching CACHEKEY have been merged.
- Ensure that there exists a milestone for the following version.
- Ensure the release changelog has been merged (the release summary is required for the final release).
- In a PR against
vX.X
(for testing):- Update the version number in
tools/configure/configure.ml
. - Only update the magic numbers for the final release.
- Set
is_a_released_version
totrue
.
- Update the version number in
- Set the tag
VX.X...
usinggit tag -s
. - Push the new tag with
git push upstream VX.X... --dry-run
(remove the--dry-run
and redo if everything looks OK). - Set
is_a_released_version
tofalse
(if you forget about it, you'll be reminded by the test-suite failing whenever you try to backport a PR with a changelog entry). - Close the milestone.
- Send an e-mail on Coqdev + the Coq development category on Discourse ([email protected] + [email protected]) announcing that the tag has been set so that package managers can start preparing package updates (including a
coq-bignums
compatible version). - In particular, ensure that someone is working on providing an opam package (either in the main ocaml/opam-repository for standard releases or in the
core-dev
category of the coq/opam-coq-archive for preview releases. - Make sure to cc
@erikmd
to request that he prepares the necessary configuration for the Docker release incoqorg/coq
(namely, he'll need to make sure acoq-bignums
opam package is available inextra-dev
, respectivelyreleased
, so the Docker image gatheringcoq
andcoq-bignums
can be built). - Publish a release on GitHub with the PDF version of the reference manual attached. The PDF can be recovered from the artifacts of the
doc:refman-pdf:dune
job from continuous integration.
- In coordination with platform maintainers, announce the release candidate to Coq-Club and Discourse ([email protected] + [email protected]) with the message that:
- the release candidate is stable: library authors can safely start preparing compatible releases;
- in particular, the authors of packages that are included in the platform should do so as soon as possible to avoid delaying the platform release (and remind the expected calendar);
- a further announcement will follow when the platform is ready to install this version of Coq.
- Modify the version number in the file
incl/macros.html
on the website. - Ping
@Zimmi48
to switch the default version of the reference manual on the website. This is done by logging into the server (vps697916.ovh.net
), editing twoProxyPass
lines (one for the refman and one for the stdlib doc) withsudo vim /etc/apache2/sites-available/000-coq.inria.fr.conf
, then runningsudo systemctl reload apache2
. TODO: automate this or make it doable through thewww
git repository. See coq/www#111 and coq/www#131.
- Ping
@Zimmi48
to publish a new version on Zenodo. TODO: automate this with coqbot.
- Sign the Windows and MacOS packages and upload them on GitHub.
- The Windows packages must be signed by the Inria IT security service. They should be sent as a link to the binary (via filesender for example) together with its SHA256 hash in a signed e-mail to
dsi.securite
@inria.fr
putting@maximedenes
in carbon copy. - The MacOS packages should be signed with our own certificate.
- The Snap package has to be built and uploaded to the snap store by running a platform CI job manually. Then ask a Platform maintainer with access to the store to publish the upload or give you access so that you can do it yourself.
- The Windows packages must be signed by the Inria IT security service. They should be sent as a link to the binary (via filesender for example) together with its SHA256 hash in a signed e-mail to
- Announce the release to Coq-Club and Discourse ([email protected] + [email protected]).