Skip to content

test more

test more #29

Triggered via push April 3, 2024 16:51
Status Failure
Total duration 44s
Artifacts

compile.yml

on: push
build_against_master
8s
build_against_master
Matrix: build_against_packages
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build_against_master
Process completed with exit code 100.
build_against_packages (60lts)
Process completed with exit code 100.
build_against_packages (75)
The job was canceled because "_60lts" failed.
build_against_packages (75)
The operation was canceled.
build_against_packages (74)
The job was canceled because "_60lts" failed.
build_against_packages (74)
The operation was canceled.
build_against_packages (73)
The job was canceled because "_60lts" failed.
build_against_packages (73)
The operation was canceled.