You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Case: I select a time interval where there is no measurement point near the beginning of that interval (i.e. the car was offline for some duration at the beginning). Then the left part of the diagram is empty, and the plots only begin somewhere towards the right. And this is even though older data ("beyond" the left edge of the diagram")exist in the database.
The two attached screenshots show how a 6 hr plot is empty for the first 2.5 hours, but when e.g. a 2 day duration is selected, the plots fill (almost) the entire diagram.
Would it be possible to add logic so that the system looks for the last data point before the chosen diagram interval and uses that to fill the diagram entirely?
The text was updated successfully, but these errors were encountered:
Case: I select a time interval where there is no measurement point near the beginning of that interval (i.e. the car was offline for some duration at the beginning). Then the left part of the diagram is empty, and the plots only begin somewhere towards the right. And this is even though older data ("beyond" the left edge of the diagram")exist in the database.
The two attached screenshots show how a 6 hr plot is empty for the first 2.5 hours, but when e.g. a 2 day duration is selected, the plots fill (almost) the entire diagram.
Would it be possible to add logic so that the system looks for the last data point before the chosen diagram interval and uses that to fill the diagram entirely?
The text was updated successfully, but these errors were encountered: