Skip to content
This repository has been archived by the owner on Jul 1, 2024. It is now read-only.

Workflow failure: Scheduled Jobs: Upgrade Examples #4262

Closed
pulumi-bot opened this issue May 11, 2024 · 1 comment
Closed

Workflow failure: Scheduled Jobs: Upgrade Examples #4262

pulumi-bot opened this issue May 11, 2024 · 1 comment
Assignees
Labels
kind/engineering Work that is not visible to an external user p2 Bugs that aren't P1s but should be done within the quarter resolution/fixed This issue was fixed size/S Estimated effort to complete (1-2 days).
Milestone

Comments

@pulumi-bot
Copy link
Collaborator

pulumi-bot commented May 11, 2024

Workflow Failure

Scheduled Jobs: Upgrade Examples has failed. See the list of failures below:

@pulumi-bot pulumi-bot added kind/engineering Work that is not visible to an external user needs-triage Needs attention from the triage team p1 Bugs severe enough to be the next item assigned to an engineer labels May 11, 2024
@github-project-automation github-project-automation bot moved this to 🤔 Triage in Docs 📚 May 11, 2024
@sean1588 sean1588 removed the needs-triage Needs attention from the triage team label May 13, 2024
@sean1588 sean1588 self-assigned this May 13, 2024
@sean1588 sean1588 added p2 Bugs that aren't P1s but should be done within the quarter and removed p1 Bugs severe enough to be the next item assigned to an engineer labels May 13, 2024
@sean1588 sean1588 assigned cnunciato and unassigned sean1588 May 13, 2024
@sean1588 sean1588 added this to the 0.104 milestone May 13, 2024
@sean1588 sean1588 moved this from 🤔 Triage to 🎬 Ready in Docs 📚 May 13, 2024
@cnunciato cnunciato moved this from 🎬 Ready to 💜 Review in Docs 📚 May 15, 2024
@cnunciato cnunciato added size/S Estimated effort to complete (1-2 days). resolution/fixed This issue was fixed labels May 15, 2024
@cnunciato
Copy link
Contributor

Fixed via #4278.

@github-project-automation github-project-automation bot moved this from 💜 Review to 🏁 Done in Docs 📚 May 15, 2024
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
kind/engineering Work that is not visible to an external user p2 Bugs that aren't P1s but should be done within the quarter resolution/fixed This issue was fixed size/S Estimated effort to complete (1-2 days).
Projects
Archived in project
Development

No branches or pull requests

3 participants