Earthing the AMS Switches #985

Closed
Firefishy opened this issue Nov 1, 2023 · 3 comments
Closed

Earthing the AMS Switches #985

Firefishy opened this issue Nov 1, 2023 · 3 comments
Labels
hardware location:amsterdam Equinix AM6 data centre

Comments

@Firefishy
Copy link
Member

It is recommended earth the Juniper EX4300 switches.

I have sent the earthing lugs, screws, washer and cabling. 1 cable + screw per switch.

There is a rack ground point I believe on the bottom left of the rack (looking from rear). The switches should wired into this using the provided cables.

@Firefishy Firefishy added hardware location:amsterdam Equinix AM6 data centre labels Nov 1, 2023
@Firefishy Firefishy added this to the November 2023 AMS visit milestone Nov 1, 2023
@pnorman
Copy link
Collaborator

pnorman commented Nov 2, 2023

Do we have any screwdrivers required on site?

@Firefishy
Copy link
Member Author

I included a short tiny screwdriver in the parcel which can be used to screw in the earthing screw into the side of the switch. It isn't really suitable for anything else.

I cannot remember if we left a screwdriver in the shelf box.

@pnorman
Copy link
Collaborator

pnorman commented Nov 9, 2023

Earthed to the top of the cage. The cables should really be about 20cm longer or more, I couldn't route as I wanted.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
hardware location:amsterdam Equinix AM6 data centre
Projects
None yet
Development

No branches or pull requests

2 participants