v6.2
What's Changed
- Updated network and gtfs schedule
- Network is now based on late 2022 osm data
- PT schedule is based in mid 2023, earlier data of this feed was not available
- The network conversion now uses a SUMO converter, a microscopic representation of the network will be available as well
- Free speed of the network has been calibrated as described in the paper "Road network free flow speed estimation using microscopic simulation and point-to-point travel times"
- Walking speed increased to match reference data
- Recalibration of mode constants (ASCs)
- Updated commercial traffic, especially the trip durations should be more realistic
- Added a run class for DRT scenarios
- Please note that the 6.3 version is released nearly at the same time
- Because of that 6.2 was not calibrated to the same accuracy
- Rather use the newest version, which also includes all features of 6.2
Full Changelog: v6.1.1...v6.2