Skip to content

Latest commit

 

History

History
37 lines (31 loc) · 774 Bytes

File metadata and controls

37 lines (31 loc) · 774 Bytes

V0.2 Handles

Handle1

Add handles to the extrusion tophat so you can sling that thing around. Easy to install, just follow the below steps.

NOTE - remove the top panel before you proceed. Replace panel once install is complete.



Step 1


Insert "Part A" into extrusion, vertically.

1


Step 2


Insert "Part B" into extrusion, horizontally (after you've installed the logo insert).

2


Step 3


Bolt that bad boy on.

3

That's it! Replace your top panel and get back in the game.



Handle2 Handle3