Lasair Cycle-8 April'23 to Sept'23 #284

Closed
7 tasks done
tms-epcc opened this issue Mar 9, 2023 · 1 comment
Closed
7 tasks done

Lasair Cycle-8 April'23 to Sept'23 #284

tms-epcc opened this issue Mar 9, 2023 · 1 comment
Assignees
Labels

Comments

@tms-epcc
Copy link
Contributor

tms-epcc commented Mar 9, 2023

As taken from Lasair Cycle-8 wiki planning page
See also notes from 29/MAR/23 Lasair fortnightly meeting

Top Level goals this cycle

  • port Lasair to LSST
  • deliver Lasair 5.0 on sim-stream data (D3.5.1)
  • make new long term plan

Activities this cycle
The tasks needed to deliver the above can be broken down into must-do and stretch goals.

Must do

  • Rebuild Lasair from ZTF to LSST
    • Convert LSST schema document to Lasair’s tables, with schema evolution
    • Define Lasair feature set in addition to LSST lightcurve features
    • Rebuild ingest/filter pipeline and Cassandra/Galera to work with LSST tables
  • Deliver Lasair 5.0 - See (D3.5.1)
    • Ingest existing simstream by file and by kafka, with added features
    • Rebuild website to show LSST simstream data
  • Maintain Lasair ZTF
    • Respond to bugs and user questions
    • Apply code patches as required
    • Debate future for lasair-ztf (will conclude in C9)
  • Port lasair-deploy from Heat --> Terraform (see Port lasair-deploy from Heat --> Terraform #294)
  • Start performance testing (see Scaling and profiling experiments #258)
    • Test alert distribution system works! Delivers 40-70 alerts per second.
    • Build performance-testing cluster
    • Build on performance testing plan and start implementation and measurement
  • Deliver new long-term plan for Phase C @andyxerxes (see D3.5.1 Lasair Version 5  #285)
    • Set up first draft on Overleaf based on LSST:UK Phase C plan
    • Hold brainstorm session to debate options
    • Complete plan

Later Addition

Stretch goals

  • Create new features for early explosive transients (see PET features (Possible Explosive Transient) #278)
    • Fitting exp-bazin-blackbody models
    • From Fastfinder
  • Build infrastructure for Gravitational Waves
  • Upgrade Sherlock with S hemisphere catalog
  • DELVE -- dark energy camera (what about it?)
  • Cassandra integration tests
  • Checking the monitoring of tests (added post 11/MAY/23 Lasair SE meeting)
  • Issuing of alerts from Grafana monitoring (added post 11/MAY/23 Lasair SE meeting)
@tms-epcc tms-epcc added the Epic label Mar 9, 2023
@tms-epcc tms-epcc changed the title Lasair Cycle-7 April'23 to Sept'23 Lasair Cycle-8 April'23 to Sept'23 Mar 9, 2023
@tms-epcc
Copy link
Contributor Author

18/JUL/23

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
Projects
None yet
Development

No branches or pull requests

2 participants