You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
In order to have a more efficient workflow when bulk load has one building and related match has two buildings as a LDA doing QA I want a one button solution.
Acceptance Criteria
Unlink
Remove bulk load
Copy two existing buildings
Make Geometry adjustments to both
The text was updated successfully, but these errors were encountered:
User Story
In order to have a more efficient workflow when bulk load has one building and related match has two buildings as a LDA doing QA I want a one button solution.
Acceptance Criteria
The text was updated successfully, but these errors were encountered: