The project titled ROAD CONSTRUCTION USING HIGHWAY PLANNING AND OBSTRUCTION PREVENTION aims to address one of the major issues that the Indian road construction department is facing.

License

Notifications You must be signed in to change notification settings

ayushs2k1/Operating-Systems-Project

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

10 Commits
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Road Construction Using Highway Planning and Obstruction Prevention

Table Of Contents

  • Abstract
  • Introduction
  • Project Requirements
  • Literature Survey
  • Block Diagram
  • Pseudo Code
  • Output Screentshot
  • Conclusion
  • References
  • Our Team

1. Abstract

The project titled ROAD CONSTRUCTION USING HIGHWAY PLANNING AND OBSTRUCTION PREVENTION aims to address one of the major issues that the Indian road construction department is facing. These days we notice that a large number of roads are not in proper condition and many of them require restoration. Many of which are in high usage and require immidiate repair. Our project aims to help athorities with providing them the most profitable path for road contruction for a given map and the sequence in which these roads can be addressed so that it would be convenient for both the authorities as well as the general public.Our project collects various forms regarding the map for the road that needs to be constructed, with this data we find the most shortest and profitable path possible . Then we collect data for utility and traffic for all the roads ,then we normalize the data collected and generate a appropriate sequence in which the road construction should be addressed. We have also included a deadline section so that the roads that take more then the allocated time are highlighted and if necessary removed. Also, a check for hindrance detection is added which can be used when we have limited number of resources and a proper allocation of these resources is required. For this we take inputs for resources which can refer to asphalt, machinery, mortar etc. Then we require maximum resources needed for each road, amount of resources allotted for each road, and available resources, based on which a safe sequence is generated that prevents any unwanted stoppage of work.

2. Introduction

In countries like India where we are seeing a steep rise in the overall population there arise a necessity of new habitat and scouring of vacant land to make new buildings, accommodations and environments which are connected by roads. As per the statistics we get to know that a total of 2098624 km of road was laid in India alone during the period 2001 to 2005 and these numbers are continuously rising with each passing year. So the maintenance and construction of new roads require a tremendous work force and attention from the government. So it becomes necessary to design a proper algorithm that can manage the overall process of road construction.

So the first part of the project deals with the task of getting the parameters through which a road can be assigned a particular priority and accordingly can be used for further estimations and calculations. So for this purpose we consider 3 parameters associated with a particular road namely the size,utility and the traffic associated with each road . For the purpose of getting the road size we employ yet another renowned and precise algorithm known as djikstra algorithm to get the shortest road length

Scheduling is one of the most widely used techniques to using which any operation involving several tasks can be ordered in such a way so that easy execution of the entire operation becomes possible in the most efficient way possible avoiding any sort of errors and confusions. The programme that does the task of scheduling is termed as a scheduler. Now the scheduling used in the project involves priority scheduling without the use of pre- emption(the reason for the same is explained in the later part of the project) ,So here the algorithm decides how to schedule the various construction processes in the given region based on their priorities , which in-turn is decided on the basis of various factors which are mentioned in the above paragraph of the project. So all the constructions will be handled accordingly.

In the second part of the proposed work, We tried to focus on the very common issue of delay and stopping of the entire construction process due unavailability of various resources involved in the construction process so we compared this scenario with the dead-lock condition that arises in the operating systems while assigning resources to various running processes and this lead us to use the same algorithm that we use in operating systems that is the bankers algorithm for our project as well using various resources involved in the road construction process so as to avoid any condition of an absolute deadlock state in our construction process. The resources we use are discussed in later part of the project .So using this bankers algorithm we make sure that at no situation should occur where for the lack of required resources, all work gets stopped or hindered. So, the implementation of this algorithm becomes necessary. The safe sequence advices in what order to proceed so that by the available resources, all tasks can be completed.

3. Project Resource Requirement

  • Software Requirements

    This project has been created using CODE BLOCKS C Programming language has been used for the code

  • Hardware Requirements

    Intel i3/i5/i7/i9

    Windows 7/8/8.1/10

    4 GB RAM

    4.0 GHz processor

4. Literature Survey

  • 1.Title : A Comparative Review of CPU Scheduling Algorithms AUTHORS- Mohd Shoaib and Mohd Zeeshan Farooqui

    • CONFERENCE PAPER Conference: Proceedings of National Conference on Recent Trends in Parallel Computing (RTPC - 2014)
    • At: Aligarh, India

    Published in November 2014

ADVANTAGES: CPU Scheduling decides which tasks are to be ordered in what way so that a particular algorithm is followed to queue the processes. DISADVANTAGES:There is no involvement of premptive SRTF in the paper , the comparision is done only considering the non preemptive SRTF

  • 2.Title : A Comparative Study of CPU Scheduling Algorithms AUTHORS: Neetu Goel ,Dr. R.B. Garg

    • Journal: International Journal of Graphics & Image Processing IJGIP [ VOL-2 , Issue- 4],

    Published in November 2012

ADVANTAGES: This research paper shows that First Come First Serve (FCFS) & Shortest Job First (SJF) is generally suitable for batch operating systems and Round Robin (RR) & Priority Scheduling (PS) is suitable for time shaing systems.

DISADVANTAGES: No new algorithm was proposed in this paper

  • 3.Title: Design and Implementation of Multi parameter Dijkstra’s Algorithm: A Shortest path algorithm for real road networks. AUTHORS: Nishtha Kesswani, Dinesh Gopalani

    • Journal: International Journal of Advances in Engineering and Research [Volume 2, Issue 3],

    Published in september 2011

ADVANTAGES: Taking the real road networks into consideration, this paper suggests a modification of Dijkstra's algorithm, the multi-parameter Dijkstra’s algorithm (MPD) that considers multiple parameters into consideration. Apart from the distance between any two nodes, it considers factors such as time taken to travel from the source to the destination, congestion of the route etc. so that the user can select the desired route based on his/her preferences.

DISADVANTAGES: Cosiderable importance was not given to traffic and utility of roads

  • 4.Title: Performance of deadlock avoidance algorithms in flexible manufacturing systems. AUTHORS: Maria P. Fanti,Bruno Maione,Saverio Mascolo,Biago Turchiano

    • Journal: Journal of Manufacturing Systems(Elsevier) [Volume 15, Issue 3]

    Published in 1996

ABOUT: This paper compares performances of some deadlock avoidance policies. First, theoretical analysis is carried out by introducing a criterion for ordering different policies by flexibility in resource allocation. Second, avoidance policies are applied to some case studies, which are simulated in detail. The simulation analysis confirms the theoretical results showing that the algorithms allowing larger flexibility in resource allocation lead to better performance indices.

  • 5.Title: Approaches for Deadlock Detection and Deadlock Prevention for Distributed Systems. AUTHORS: Dhiraj Gupta, V.K Gupta (Department of Computer Science,NIMS University,Jaipur,Rajasthan, India

    • Journal: Res. J. Recent Sci., Volume 1, Issue (ISC-2011)

    Published in 2011

ABOUT: This paper, discusses about deadlock detection techniques and present approaches for detecting deadlocks in Distributed Systems. In many other aspects of distributed systems, they are harder to detect, avoid, and prevent. Deadlocks are a fundamental problem in distributed systems. Deadlock detection is more difficult in systems where there is no such central agent and processes may communicate directly with one another.

  • 6.Title: A Review Study on the CPU Scheduling Algorithms. AUTHORS: Shweta Jain(Department of Computer Science, Shri R.G.P. Gujarati Professional Institute) , Dr. Saurabh Jain(Institute of Computer Applications, Shri Vaishnav Vidyapeeth Vishwavidyalaya)

    • Journal: International Journal of Advanced Research in Computer and Communication Engineering IJARCCE [Vol. 5, Issue 8]

    Published in August 2016

ABOUT: In this paper, a review of techniques proposed by different authors are discussed which is helpful to design Operating Systems and new researches in Scheduling. System designers have many complex decisions that they are required to make before finalizing their designs. The selections of the appropriate processor scheduling algorithms allow them to tailor the design to perform at the highest level of performance, reducing overall idle time. Design specifications will drive decisions such as responsiveness, preemption, and reliability. These combinations can benefit both single processor and multiprocessor systems if selected in the proper combination.

  • 7.Title: Research on the optimization of Dijkstra’s Algorithm and its application. AUTHORS: Arjun RK, Pooja Reddy, Shama, M.Yamuna

    • Journal: International Journal of Science, Technology & Management IJSTM [Vol. 4, Issue 1]

    PUBLISHED IN APRIL 2015

ABOUT: This paper mainly studied the application of the shortest path algorithm based on the data structure, and proposed the improved Dijkstra’s algorithm, which optimized selection of the shortest path node and data storage structure and organization. Studies showed that, compared with the traditional Dijkstra’s algorithm, the optimized Dijkstra’s algorithm which has optimized the space complexity, time complexity and storage combination reduced the storage space, reduced data redundancy and greatly improved the running rate. It was clearly shown that the optimized algorithm is more applicable to calculate the shortest path.

5. Block Diagram

Explanation:

  1. First we take inputs for the number of roads
  2. Then we will take inputs for the formation of map in form of graph for all the different roads
  3. Then based on the graph we will apply dijakstra algorithm and find the shortest distance possible between the desired cities
  4. This distance is saved as a parameter of size for the roads
  5. Also the route of the shortest path will be displayed
  6. Then we read the utility, traffic and deadline for all the roads
  7. Based on these inputs we check for clashing between the priorities
  8. If present the clashing is handled
  9. Then the required sequence is generated
  10. Based on the sequence we find the waiting and completion times for the roads
  11. Now we check if the roads can be completed within their allocated time
  12. If deadline is crossed then an error message “DEADLINE NEEDS TO BE COMPROMISED IS DISPLAYED”
  13. If dead line is not passed the generated sequence is displayed and we move to the second part of project
  14. Here we read the number of resources needed for each road,maximum resources needed for each road, amount of resources allotted for each road, and available resources
  15. Based on which a safe sequence is generated
  16. If sequence is not generated then an error message is displayed

6. Pseudo Code

PSEUDO CODE FOR DIJAKSTRA FOR FINDING SHORTEST PATH FOR ROADS -> INPUTS AND ALGORITHM ->

1- FIRSTLY, WE WILL TAKE THE INPUT FOR THE FORMATION OF MAP FOR DIJAKSTRA

2- THIS INVOLVES TAKING THE INPUT FOR NUMBER OF CITIES(NODES); NUMBER OF ROUTES CONNECTING THEM(EDGES); AND THE DISTANCE OF THE ROUTES(WEIGHT OF EDGES)

3- THEN WE APPLY THE DIJAKSTRA ALGORITHM FOR THE MAP(GRAPH) AS FOLLOWS

function Dijkstra(Graph, source)

       dist[source] := 0                              // Distance from source to source is set to 0
       
       for each vertex v in Graph:                    // Initializations
       
       if v ≠ source
             dist[v] := infinity                          // Unknown distance function from source to each node                                                                 set to infinity
        add v to Q                                     // All nodes initially in Q
        
        while Q is not empty:                          // The main loop
              v := vertex in Q with min dist[v]              // In the first run-through,this vertex is the source                                                                 node
              remove v from Q
        
        for each neighbor u of v:                      // where neighbor u has not yet been removed
                                                          from Q.
              alt := dist[v] + length(v, u)
              if alt < dist[u]:                              // A shorter path to u has been found
                    dist[u] := alt                                 // Update distance of u

return dist[]

4- THEN FROM THE OBTAINED DISTANCE ARRAY WE FIND THE DESTIANTION VERTEX

5- THE DISTANCE IS THEN SAVED AS SIZE FOR THE ROAD

PSEUDO CODE FOR PRIORITY SCHEDULING FOR SCHEDULING THE ROADS INPUTS AND ALGORITHM ->

1- FIRSTLY, WE TAKE THE INPUT FOR THE NO OF ROADS.

2- NOW HERE WE ASSIGN THE PRIORITIES FOR EACH ROAD BASED ON A NO OF PARAMETERS NAMELY SIZE, UTILITY, TRAFFIC.

3- NOW FOR SIZE WE EMPLOY DIJKSTRA’S ALGORITHM FOR GETTING THE LEAST POSSIBLE PATH FOR THE CONSTRUCTION OF OUR ROAD.

4- FIRST, WE GENERATE A SEQUENCE IN WHICH THE CONSTRUCTION WORK SHOULD PROCEED. THIS SEQUENCE IS GENERATED ON THE BASIS OF PRIORITY SCHEDULING ALGORITHM. SO, IN THIS ALGORITHM WE USE THE ABOVE PARAMETERS AND SUM THEM UP AND NORMALISE THEM DOWN TO 1-100 TO GET THE PRIORITY FOR ANY CONSTRUCTION PROJRCT.

5- Which is done by using:

Priority Pi of road i = (Si / Sigma(Si)) *100

Where Si for any given road i is submission of size, utility and traffic

6- PRIORITY SCHEDULING WITHOUT PREEMPTION IS APPLIED AS FOLLOWS

function Priority Scheduling(Processes,Priority,Arrival_Time,Burst_Time)
        
        Current_Time := 0                                //Current Time of the CPU
        
        while (All Processes are not executed):
               
               P:=All the processes whose Arrival_Time=<Current_Time
               
               i := index of the process with highest Priority in P
               
               If(No index is found)                            //CPU in ideal state , no process arrived yet
               
               Current_Time++
        
        Else
               
               Execute the process P[i]
               
               Current_Time=Current_Time+Burst_Time[i]
               
               Completion_Time[i] = Current_Time
               
               Turnaround_Time[i] =Completion_Time[i] - Arrival_Time[i]
               
               waiting_time[i] = turnaround_time[i]- burst_time[i]
               
               response_time[i] = start_time[i] - arrival_time[i]

7- ALSO FOR THE ABOVE CASE IF A SCENARIO OCCURS WHERE THE PRIORITIES OF TWO ROAD CLASHES THEN FIRST WE GO FOR THE UTILITY OF THE ROADS TO DECIDE THE PRIORITY THEN TRAFFIC AND THEN SIZE.

8- SO ONCE WE HAVE GIVEN ALL THE REQUIRED INPUTS FOR PARAMETERS , WE WILL ALSO BE ASKING THE USER TO ENTER THE DEADLINE AS WELL AS THE EXPECTED COMPLETION TIME. OUTPUTS OBTAINED ->

9- SO, AFTER SUCCESSFUL EXECUTION WE WILL BE GETTING THE WAITING TIME AS WELL AS THE TOTAL TIME CORRESPONDING TO EACH OF THE CONSTRUCTION PROCESSES.

10- IN ADDITION TO THAT WE WILL BE GETTING THE TURNAROUND TIMES FOR EACH CONSTRUCTION AS WELL.

PSEUDO CODE FOR BANKERS ALGORITHM ->

1- SO, THIS ALGORITHM IS USED TO GIVE A SAFE SEQUENCE FOR THE CONTINUATION OF CONSTRUCTION PROCESSES AT ALL TIMES.

2- WE TAKE THE INPUT OF

  • NO OF RESOURCES THAT ARE REQUIRED FOR THE CONSTRUCTION OF THE ROAD
  • THE ALLOCATION OF THESE RESOURCES THAT THE CONSTRUCTION AUTHORITY HAS DONE.
  • THE MAXIMUM RESOURCES THAT A PARTICULAR ROAD WILL REQUIRE AT ANY STAGE IN THE CONSTRUCTION PROCESS.
  • AND LASTLY THE AVAILABILITY OF THESE RESOURCES WITH THE CONSTRUCTION RESOURCES CURRENTLY.

3- AFTER ALL THESE INPUTS THE STANDARD NEED MATRIX OF THE BANKERS ALGORITHM IS CALCULATED.

4- NOW FOR EACH PROJECT WE COMPARE WHETHER THE ALLOCATION IS GREATER OR EQUAL TO THE NEED ARRAY FIGURES FOR THE FOLLOWING PROJECT IN CASE SUCH A PROJECT IS FOUND WE PROCESS IT AND THEN TAKES BACK THE ALLOCATED RESOURCES FROM THAT PARTICULAR PROJECT AND GIVES IT TO THE AVAILABLE ARRAY .

5- THE SAME PROCESS IS REPEATED UNTILL WE DON’T SATISFY THE NEED OF EACH PROJECT.

6- IN CASE WE FAIL TO FIND A PROCESS AT ANY PARTICULAR STAGE SUCH THAT THE NEED OF NO PROCESS IS SATISFIED BY THE AVAILABLE MATRIX WE PRINT “ NO SAFE SEQUENCE FOR CONSTRUCTION WITH THE AVAILABLE NO OF RESOURCES”.

7- OTHER WISE WE PRINT THE SEQUENCE WHICH NEEDS TO BE FOLLOWED FOR SAFE COMPLETION OF ALL PROJECTS.

7. Output Screenshots

OUTPUT-1 (Deadline compromised,Clash of priority,Safe sequence exists)

OUTPUT-2 (No Deadline issue, No Clash of priority,Safe sequence does not exist)

8. Conclusion

The proposed model is highly recommended as it successfully implements all the ideas that were initially put forth. The main purpose was to find out order in which a group of roads are mended or constructed so that within short time and correct resources, the roads are dealt with, without any ambiguity, prioritizing the important ones over the others. So in this way we get an ideal sequence for a large set of construction processes ongoing in the entire country which would not have been possible to deal with manually .The designed model is also able to find the most profitable route for the road construction whose map was given to us. By applying dijkstra algorithm to this map we were able to find the profitable route for construction .The model is also able to checks the safe sequence based on the data available to the authorities, whereby it says if the certain available resources is enough for the safe mending of all the given roads.

Now we discuss that The reason to implement Priority Scheduling over the other methods is to ensure that the correct purpose is met and solved. In the given scenario, using other efficient algorithms like Shortest Job First is not feasible because the prior knowledge of every parameter is not sometimes possible because continuous damage of various other roads is possible in real life, and hence they will keep adding to the list making it impossible for roads of higher priorities to get completed. Also, the interruption of a going on task and resuming of others, while resuming the first one later is not possible in this scenario because an important road cannot wait forever once mending it has been started. The traffic and utility of that particular road does not allow it to wait for others. Hence, the best possible algorithm for the implementation was Priority Scheduling.

9. References

1- Mohd Shoaib and Mohd Zeeshan Farooqui, A Comparative Review of CPU Scheduling Algorithms, Proceedings of National Conference on Recent Trends in Parallel Computing (RTPC - 2014), NOVEMBER 2014

2- Neetu Goel ,Dr. R.B. Garg,A Comparative Study of CPU Scheduling Algorithms, International Journal of Graphics & Image Processing IJGIP [ VOL-2 , Issue-4], November 2012

3- Nishtha Kesswani, Dinesh Gopalani, Design and Implementation of Multi parameter Dijkstra’s Algorithm: A Shortest path algorithm for real road networks. International Journal of Advances in Engineering and Research [Volume 2, Issue 3], September 2011

4- Maria P. Fanti,Bruno Maione,Saverio Mascolo,Biago Turchiano, Performance of deadlock avoidance algorithms in flexible manufacturing systems. Journal of Manufacturing Systems(Elsevier) [Volume 15, Issue 3], 1996

5- Dhiraj Gupta, V.K Gupta ,Approaches for Deadlock Detection and Deadlock Prevention for Distributed Systems, Res. J. Recent Sci., Volume 1, Issue (ISC- 2011),2011

6- Shweta Jain , Dr. Saurabh Jain, A Review Study on the CPU Scheduling Algorithms, International Journal of Advanced Research in Computer and Communication Engineering IJARCCE [Vol. 5, Issue 8], AUGUST 2016

7- Research on the optimization of Dijkstra’s Algorithm and its application, International Journal of Science, Arjun RK,Pooja Reddy,Shama,M.Yamuna,Technology & Management IJSTM [Vol. 4, Issue 1], APRIL 2015

Our Team

Pilla Vaishno Mohan, Mateen Jamal, Anant Tiwari and Ayush Sharma

About

The project titled ROAD CONSTRUCTION USING HIGHWAY PLANNING AND OBSTRUCTION PREVENTION aims to address one of the major issues that the Indian road construction department is facing.