chore: Replace pre-commit with goose #748
ci.yaml
on: pull_request
Static analysis
14s
Type check
17s
Check packaging metadata
/
Build and check package metadata
19s
Build Sphinx Docs
17s
Matrix: Test
Annotations
17 errors
Static analysis
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Type check
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Type check
The operation was canceled.
|
Build Sphinx Docs
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Build Sphinx Docs
The operation was canceled.
|
Test (3.13-dev)
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Test (3.13-dev)
The operation was canceled.
|
Test (3.10)
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Test (3.10)
The operation was canceled.
|
Check packaging metadata / Build and check package metadata
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Check packaging metadata / Build and check package metadata
The operation was canceled.
|
Test (3.11)
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Test (3.11)
The operation was canceled.
|
Test (3.12)
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Test (3.12)
The operation was canceled.
|
Test (3.9)
Canceling since a higher priority waiting request for 'CI-chore/switch-to-goose' exists
|
Test (3.9)
The operation was canceled.
|