Skip to content

Latest commit

 

History

History
13 lines (11 loc) · 779 Bytes

Tests.md

File metadata and controls

13 lines (11 loc) · 779 Bytes

Development tests

  • Send GPS to sleep, measure supply current dropped significantly, wake it up, make sure NMEA data are coming
  • Send all devices to sleep/suspend, measure the current is in range of uA
  • Make sure the GPS is able to get fix in the first fix scenario
  • Make sure the GPS gets fix within 10 seconds if had fix before and was sleeping for 30 minutes afterwards

Prod tests

  • Connect battery, the device should initialize, measure all required data and send it over LoRa to cloud
  • Make sure the current drops to uA range
  • Make sure the device wakes up after 30 minutes and sends data again
  • Make sure the device times out waiting for GPS if no GPS signal is available
  • Put device in freezer for a week, make sure it continues to operate for the whole time