You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Aug 30, 2024. It is now read-only.
I want to be able to specify an amount which should be finished in the assembler. I know I can go back and change what I put into the assembler, that can sometimes be 20-40 assemblers. It is therefore easier to just specify what you want finished in there, so you don't have to go back.
I am uncertain how best to add such a value. As the Amount field is already used (or abused). I can see 3 options:
Move the auto-fill amount to the auto-fill panel. Which opens the amount field for set recipe.
Add a Wait-for amount somewhere in the modifier panel.
Change wait-for to only block when recipe progress is < 90%.
I think we should do option 2 and put it into the modifier field, so it is "wait for 5" if you want to wait for 5 units. This way we don't introduce a breaking change by moving/changing the "meaning" of amount.
The text was updated successfully, but these errors were encountered:
theis999
changed the title
I want to be able to specify an amount which should be finished in the assembler. I know I can go back and change what I put into the assembler, that can sometimes be 20-40 assemblers. It is therefore easier to just specify what you want finished in there, so you don't have to go back.
I want to be able to specify an amount which should be finished in the assembler.
May 15, 2023
theis999
changed the title
I want to be able to specify an amount which should be finished in the assembler.
Specify an amount which should be finished in the assembler.
May 15, 2023
Sign up for freeto subscribe to this conversation on GitHub.
Already have an account?
Sign in.
The text was updated successfully, but these errors were encountered: