Add the plate fixations (6) to the backplate (2), analogously to the large sprocket module - numbered parts shown in Figure 24. Attach the sprocket (3) to the front plate (1), then mount the front plate to the backplate.
+Add the plate fixations (6) to the backplate (2), analogously to the large sprocket module - numbered parts shown in Figure 27. Attach the sprocket (3) to the front plate (1), then mount the front plate to the backplate.
The recommended assembly order goes as follows. First, attach the large side panel (4), the crank side panel (6) with the crank (2), the drivetrain panel (5), the lower side panel (3), and the roller mounting platform (1) to the frame - numbered part list shown in Figure 36.
+The recommended assembly order goes as follows. First, attach the large side panel (4), the crank side panel (6) with the crank (2), the drivetrain panel (5), the lower side panel (3), and the roller mounting platform (1) to the frame (7) - numbered part list shown in Figure 36.
Contributors:
- Philippe Colbach 0009-0004-5631-8744 author, maintainer
- Jakub Tkaczuk 0000-0001-7997-9423 supervisor, developer
- Elizabeth Tilley 0000-0002-2095-9724 supervisor
Github repository for this page sits here.
+
+
This work is certified by the Open Source Hardware Association.
+
Github repository for this page sits here.
+
This documentation details the construction, operation, and maintenance of the glass crusher that was built as part of a collaboration between the Malawian nonprofit organization Sustainable Cape Maclear and the Global Health Engineering Group at ETH Zürich.
The glass crusher uses two roller mills to crush the glass. The rollers are rotated using a crank and a drivetrain made mostly from motorcycle parts. It is a mostly closed construction to shield the operator(s) from glass dust and shards.
24 x screw M6 x 16,1 x screw M6 x 20, 2 x screw M6 x 25, 12 x screw M6 x 30, 4 x screw M6 x 45, 2 x stud M6 x 20, 53 x nut M6, 67 x washer M6, 5 x screw M10 x 20
12 x screw M10 x 30, 1 x stud M10 x 90, 2 x stud M10 x 120, 23 x nut M10, 19 x washer M10↩︎
24 x screw M6 x 16, 1 x screw M6 x 20, 2 x screw M6 x 25, 12 x screw M6 x 30, 4 x screw M6 x 45, 2 x stud M6 x 20, 53 x nut M6, 67 x washer M6, 5 x screw M10 x 20