Releases: ECCE-EIC/macros
prop.2.1-production-pythia8
Production v2.1: June 2021 Concept
Changes from production 2.0:
(1) Event and Jet evaluator have been disabled in production. Will be produced in second stage processing
(2) Missing semicolon added in Fun4All_G4_EICDetector.C which caused all jobs to crash in 2.0
prop.2.1-production
Production v2.1: June 2021 Concept
Changes from production 2.0:
(1) Event and Jet evaluator have been disabled in production. Will be produced in second stage processing
(2) Missing semicolon added in Fun4All_G4_EICDetector.C which caused all jobs to crash in 2.0
prop.2.0_production_singlePion_0-20GeV
Merge production into production_singlePion_0-20GeV
prop.2.0_production_singleElectron_0-20GeV
Merge production into production_singleElectron_0-20GeV
Pre-production June 2021 Concept
This tag holds the June 2021 concept BEFORE we start testing the reconstruction. There will be some debugging to be done and a v1.0 will be released before we launch full production.
Detector configuration table:
Detector | Component Name | Brief description | Location | Dimension | Fast/Full geometry? |
g4detector code ready? | Reference implimentation in https://github.com/eic/fun4all_eicmacros |
ECCE macros done? (by sim team) |
Open Action Item | Notes |
---|---|---|---|---|---|---|---|---|---|---|
Field map | Y | standard with field return. Open return map available | ||||||||
Beam pipe | Central Beam Pipe | Be pipe | IP | R=3cm, -60-80cm | Full | y | https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L75 | Y | Suggest to further add +2um Au coating for SynRad control | |
Beam pipe | Central Beam Chamber | Beam chamber Mar2020 model | IP | -4.5m to 4.5m | Full | y | https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L105 | Y | To be upgrade to new model by project | |
Tracking | Barrel vertex | ITS3 | See "Tracking reference layout" | Full | y | Y | Double check tracking association | |||
Tracking | Barrel silicon | Full | y | |||||||
Tracking | Barrel MPGD | Fast | y | Y | Swtitch to Ar:CO2:CF4 in 45:15:40 % ratio considering 45 microns spatial resolution is with this gas mixture. | |||||
Tracking | h-going silicon layers | See "Tracking reference layout" | Fast | y | Y | |||||
Tracking | e-going silicon layers | Fast | y | Y | ||||||
Tracking | h-going GEM | Fast | y | Y | Update to EIC prototype geometry description | ~ePHENIX GEM design as of now, use 70um resolution | ||||
Tracking | e-going GEM | Fast | y | Y | ||||||
Tracking | Support barrel | Fast | y | Y ... |
Pre-production SIDIS
This tag is for the production macros BEFORE we launch the full production. Small local tests work on batch systems but there will likely be updates when we get feedback from PWGs and test the user-friendliness of the scripts