Skip to content

Releases: ECCE-EIC/macros

prop.2.1-production-pythia8

20 Jul 22:28
228d5b5
Compare
Choose a tag to compare

Production v2.1: June 2021 Concept

Changes from production 2.0:
(1) Event and Jet evaluator have been disabled in production. Will be produced in second stage processing
(2) Missing semicolon added in Fun4All_G4_EICDetector.C which caused all jobs to crash in 2.0

prop.2.1-production

20 Jul 22:29
Compare
Choose a tag to compare

Production v2.1: June 2021 Concept

Changes from production 2.0:
(1) Event and Jet evaluator have been disabled in production. Will be produced in second stage processing
(2) Missing semicolon added in Fun4All_G4_EICDetector.C which caused all jobs to crash in 2.0

prop.2.0_production_singlePion_0-20GeV

16 Jul 20:48
419662c
Compare
Choose a tag to compare
Merge production into production_singlePion_0-20GeV

prop.2.0_production_singleElectron_0-20GeV

16 Jul 20:49
fb01759
Compare
Choose a tag to compare
Merge production into production_singleElectron_0-20GeV

Pre-production June 2021 Concept

22 Jun 15:44
38efad6
Compare
Choose a tag to compare

This tag holds the June 2021 concept BEFORE we start testing the reconstruction. There will be some debugging to be done and a v1.0 will be released before we launch full production.

Detector configuration table:

Detector Component Name Brief description Location Dimension Fast/Full
geometry?
g4detector code ready? Reference implimentation in
https://github.com/eic/fun4all_eicmacros
ECCE macros done?
(by sim team)
Open Action Item Notes
Field map Y standard with field return. Open return map available
Beam pipe Central Beam Pipe Be pipe IP R=3cm, -60-80cm Full y https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L75 Y Suggest to further add +2um Au coating for SynRad control
Beam pipe Central Beam Chamber Beam chamber Mar2020 model IP -4.5m to 4.5m Full y https://github.com/eic/fun4all_eicmacros/blob/master/common/G4_Pipe_EIC.C#L105 Y To be upgrade to new model by project
Tracking Barrel vertex ITS3 See "Tracking reference layout" Full y Y Double check tracking association
Tracking Barrel silicon Full y
Tracking Barrel MPGD Fast y Y Swtitch to Ar:CO2:CF4 in 45:15:40 % ratio considering 45 microns spatial resolution is with this gas mixture.
Tracking h-going silicon layers See "Tracking reference layout" Fast y Y
Tracking e-going silicon layers Fast y Y
Tracking h-going GEM Fast y Y Update to EIC prototype geometry description ~ePHENIX GEM design as of now, use 70um resolution
Tracking e-going GEM Fast y Y
Tracking Support barrel Fast y Y ...
Read more

Pre-production SIDIS

06 May 15:47
Compare
Choose a tag to compare

This tag is for the production macros BEFORE we launch the full production. Small local tests work on batch systems but there will likely be updates when we get feedback from PWGs and test the user-friendliness of the scripts