ValueError: Reference and/or secondary dates were not connected in their coverage (multipolygons)
#154
Labels
bug
Something isn't working
From Processing over Track 137 in CA, there were some jobs that were cancelled before getting into ISCE2 processing. These are extraordinarily rare, but worth tracking. (Less than 20 jobs of ~10,000 submitted).
Here are some jobs that gave such an error:
May also be related to frame-enumeration submission.
The text was updated successfully, but these errors were encountered: